EPC-600 Scope Management using Oracle Primavera Cloud
EPC-600 Scope Management using Oracle Primavera Cloud
This e-learning course from Aram Academy combines a solid theoretical foundation with direct practical application, ensuring that participants not only understand scope and costs but also effectively manage them within projects. The course is designed for (prospective) project controllers, cost engineers, and project managers who want to structure, streamline, and professionalize their work processes.
The learning path begins with thoroughly defining and managing scope and costs. Participants learn how scope is defined, monitored, and modified; how cost structures are logically organized; and how budgeting, forecasting, and performance measurement are linked to planning. The focus is on the interrelationship between scope, planning, and costs as the foundation for predictable project outcomes and informed decision-making.
This methodology is then implemented in Oracle Primavera Cloud, which takes professional project control a significant step further. Instead of managing scope separately, it is directly linked to planning and progress. Changes in scope are demonstrably reflected in time and costs, transforming scope from an administrative document into an active management tool. As a result, this solution offers what many organizations lack: genuine, manageable, and transparent scope control within projects.
Via e-learning: €249, excluding VAT
Topics
Topics
This e-learning course from Aram Academy combines a strong theoretical foundation with hands-on software application, enabling participants to learn how to professionally manage scope and costs and apply these skills within Oracle Primavera Cloud. The course is designed for (prospective) project controllers, cost engineers, and project managers who want to standardize and streamline their work processes.
- AAC‑100 – Scope & Cost Management
In this theoretical training course, participants learn how scope and costs are systematically organized and managed within a project environment. Topics include defining and monitoring scope, change control, cost structures (such as the link between the WBS and CBS), budgeting, forecasting, and performance measurement. The strong focus on the relationship between scope, planning, and costs provides a reliable foundation for decision-making and predictable project results. - OPC-600 – Scope Management using Oracle Primavera Cloud
In this software training course, theory is translated into practice in Oracle Primavera Cloud. Participants learn how scope is defined, structured, and modified, and how scope changes impact scheduling and costs. The focus is on a manageable approach in which scope is used transparently, verifiably, and demonstrably as a control tool within projects.
After registering, you’ll receive 30 days of full access to the complete e-learning course package. During this period, you can take all modules as many times as you like and study at your own pace, wherever and whenever it suits you. At the end of these 30 days, you can easily extend your access to the course for a small fee. You can do this directly through the learning platform, so you can continue learning without interruption.
You must have an Oracle Primavera Cloud license.
-
Duration 30 days
-
Enrollment Formats Open enrollment
-
Delivery Formats Elearning
-
Learning Format Course
-
Spoken language
-
Coursebook Temporarily accessible digital learning environment
-
Availability 24 hours a day
-
Language course book English
-
Prerequisites Project planning is a plus
-
Minimum number of participants
-
Maximum number of participants
-
Completion Certificate of participation